Three-component cap assembly line for a space-constrained facility

Food Products

Challenge

Develop a custom solution for a complete post-molding assembly process for a three-component cap, while taking into account the location of load-bearing columns and ceiling height restrictions at the production site.

Implementation

  • Based on the drawings, cap sample, and plant layout provided by the customer, we designed and built a line configured for the facility’s ceiling height and adapted to the load-bearing columns located throughout the production area.
  • The fully integrated solution — feeding, sorting, vision inspection, assembly, and packaging — was assembled and tested at our production site. The customer supplied samples, which we used to carry out all industrial testing.
  • After testing, we delivered the line to Russia and completed full commissioning at the customer’s plant.

Result

  • A customized three-component cap assembly line with an output of 6,000 pieces per minute was delivered and commissioned.
  • Line operators were trained and approved for independent operation of the assembly line.
  • Regular technical support and service were established.
  • After completion of the project, the customer ordered one more assembly line.

Project implementation period: 6 months.