38 mm cap slitting line

Food Products

Challenge

The customer required a 38 mm cap slitting line to be manufactured and supplied for its production site in Russia.

Implementation

  • To test our equipment’s ability to slit the product in line with the required parameters, the customer provided a drawing and cap samples.
  • All supplied samples were processed on CSS equipment and returned to the customer for verification against final product requirements, including slit angle, number of bridges, tear-off force, and other parameters.
  • The cap samples processed on CSS equipment were tested both in the customer’s laboratory and at a bottled water producer’s manufacturing site. After successful trials, the customer decided to purchase the line.
  • We assembled the complete line at our manufacturing site in Shanghai and, in the customer’s presence, conducted a production test of 450,000 cap samples through feeding, sorting, inspection, slitting, and packaging stages.
  • The finished line was installed and commissioned at the customer’s plant.

Result

  • A 38 mm cap slitting line with an output of 48,000 finished parts per hour was delivered to the customer’s facility.
  • The customer’s operators and technicians were trained for independent operation and maintenance of the line.

Project implementation period: 3 months.